TransportationLandscape & Irrigation

Interstate 76 Atwood – Sterling

This project spanned for 10 miles between the towns of Atwood and Sterling. The entire north side, median, and south side of I-76 was treated with over 20,000 yards of compost material applied with 4WD tractors, towing specialized compost spreaders. Soil tillage, drill seeding, straw mulching, and mulch tackifier had to be applied simultaneously. Erosion control blankets were installed on approximately 20 miles of buffer strips and at all bridge abutments. A large fleet of revegetation equipment and crews were utilized to keep up with the scheduling demands of this project that spanned over two (2) years.

PROJECT:

Interstate 76 Atwood – Sterling

CLIENT:

Castle Rock Construction


LOCATION:

Sterling, Colorado